top of page
David Moyal

GE Renewable Energy inaugurates the world’s most advanced facility for fully automated construction

  • Grand opening in Bergen, NY of the new state of the art facility on April 21, 2022

  • The 3D concrete printing facility is the largest and most advanced in the world in terms of printer used, automated functions, printed concrete output per hour, and crew size

  • The world-class facility includes a new printer system from COBOD, which is the most productive 3D concrete printer in the world, with a print output of concrete of more than 10 tons per hour

  • The new printer system from COBOD has two X-axis converting the printer from being “just” a concrete printer into being a multifunctional construction robot, that automatically handles the concrete printing as well as reinforcement at the same time Read full article from COBOD here

0 views0 comments

Recent Posts

See All

Comments


bottom of page